772

PROVISIONAL DELIVERY OF THE PILOT AREA OF MARAZA

On March 4, 2022, the Beira Urban Development Society (SDUBeira) and the Beira Municipal Council (CMB) officially received from the contractor the pilot area of ​​3 hectares prepared with basic infrastructure for the construction of the first buildings of the Maraza Residential and Commercial Park. SDUBeira took advantage of the moment to introduce the area to local entrepreneurs by holding a presentation ceremony for the area.

During the event, the basic infrastructure included in the 3 hectares was presented, namely: sewage systems with a rainwater treatment station, opening of access roads, construction of a water supply system, public lighting, landfill, and plot demarcation. All this infrastructure was prepared in detail to the minimum detail and was financed by the Kingdom of the Netherlands.

The president of CMB, Albano Carige, challenged local entrepreneurs to “Transform this area into a citadel that conveys well-being to the community, especially to those who will inhabit it,” and on behalf of local entrepreneurs, the president of the Beira Commercial Association (ACB), Felix Machado, praised the municipality’s initiative and committed to working with SDUBeira in promoting this project to local entrepreneurs. Additionally, SDUBeira’s CEO, Emmy Bosten, invited real estate developers to explore different opportunities available in the Maraza Park and discuss possible partnerships beneficial to both parties.

TV Miramar news report

Galeria de imagens